NimbRo-OP2 / OP2X
Based on published sources · Not tested by us ·
Overview
Two humanoid soccer research designs with separate CAD, actuator selections and fabrication requirements. [S001]
OP2 and OP2X share a hardware repository, but each has its own CAD directory and bill of materials. Their actuator rows specify 34 MX106 units for OP2 and 34 XM540-W270 units for OP2X. These are actuator counts, not a claim that either robot has 34 independent joint axes. Match the controller, cabling and mechanical files to the chosen variant. [S001] [S005] [S006]
Specifications
| Detail | Description |
|---|---|
| Type | OP2 and OP2X humanoid soccer research variants Reported by source [S001] [S005] [S006] [S009] · Checked 2026-09-30 |
| Intended users | Humanoid research laboratories; Teams with mechanical fabrication and ROS integration experience Editorial assessment [S001] · Checked 2026-09-30 |
| Assembly | Not known |
| Calibration | Not known |
| Operating system | Not known |
| Computer needed | OP2 reference NUC7I7BNH excludes RAM/SSD; OP2X reference mini-ITX configuration lists i7-8700T and optional low-profile GTX 1050 Ti Reported by source [S001] [S005] [S006] [S009] · Checked 2026-09-30 |
Assembly and use
Fabrication choices change the order
OP2 offers machined brass gears or printed alternatives, while printed gears are the default for OP2X. The BOMs point to a durable SLS printing service for gears. OP2 also lists milled and printed neck-part alternatives; buying both would double-count a choice. Both lists call for bearing modifications, including drilling the slewing-ring mounting holes, so the work extends beyond ordering prints and tightening screws. [S001] [S005] [S006]
OP2X's list needs further reconciliation before purchasing. Several fastener quantities are blank, and the section says values and types remain to be verified. It recommends spare master/slave synchronization cables because they tend to break. These are useful maintenance inputs, but neither a completed procurement list nor a measured failure rate. [S006]
The computer configurations also differ. OP2 lists an Intel NUC reference without RAM or SSD. OP2X lists a mini-ITX reference with an i7-8700T, emphasizes the low-current T model and treats the low-profile GTX 1050 Ti as optional for deep learning. Those historical choices need current availability, fit and power checks before substitution. No delivered total has been established. [S005] [S006]
Software is a separate preservation and integration task
The university download page links a separate ROS framework, which we preserved at an immutable commit alongside the hardware archive. Its published installation requirements specify Ubuntu 14.04 and ROS Indigo. That documents a legacy starting point; this review has not established a working modern replacement or reproduced the selected robot's configuration. [S008] [S009] [S010]
The hardware CAD uses CC BY-NC-SA 3.0, while the framework has BSD-3-Clause software terms. A commercial build or parts offer therefore cannot rely on the software license alone. Assembly, calibration, replacement parts and support effort remain to be tested for one exact configuration. [S007] [S008]
Cost
No current, complete configuration-specific build cost has been established for this profile.
Source files and licenses
Available project sources support research coverage; complete build and commercial qualification remain separate.
| Layer | Availability / license |
|---|---|
| mechanical design | available · CC-BY-NC-SA-3.0 CAD terms are noncommercial; software permission does not override hardware terms. [S001] [S007] |
| electronics | not found · License not fully assessed BOM identifies purchased controllers and actuators; their complete manufacturing and firmware sources were not reconciled. [S004] [S005] [S006] |
| firmware | not found · License not fully assessed BOM identifies purchased controllers and actuators; their complete manufacturing and firmware sources were not reconciled. [S004] [S005] [S006] |
| software | available · BSD-3-Clause Separate framework archive preserved; exact robot configuration and complete dependencies not reproduced. [S008] [S009] [S010] |
| documentation | available · License not fully assessed BOMs and legacy framework documentation inspected; complete revision-matched build procedure unresolved. [S001] [S005] [S006] [S009] |
No particular learned policy or training dataset selected for this hardware review.
References
Links identify the documentation and revisions used in this profile. Access dates record when each source was retrieved.
- S001 · NimbRo / project contributors
Upstream project overview
Accessed 2026-09-30 · README.mdSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S002 · NimbRo / project contributors
Repository revision and release metadata
Accessed 2026-09-30 · a38bab234578511220a4d4940209a92644f70636Source notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S004 · NimbRo / project contributors
Pinned repository artifact inventory
Accessed 2026-09-30 · a38bab234578511220a4d4940209a92644f70636 archive file inventorySource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S005 · NimbRo / project contributors
NimbRo-OP2/NimbRo-OP2_Bill_of_Materials.xls
Accessed 2026-09-30 · Sheet1, all populated rows; extracted read-only from preserved XLSSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S006 · NimbRo / project contributors
NimbRo-OP2X/NimbRo-OP2X_Bill_of_Materials.xls
Accessed 2026-09-30 · Sheet1, all populated rows; extracted read-only from preserved XLSSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S007 · NimbRo / project contributors
Hardware license
Accessed 2026-09-30 · HARDWARE LICENSE CreativeCommonsLicense CC BY-NC-SA 3.0.txtSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S008 · NimbRo / project contributors
Separate ROS framework snapshot and license
Accessed 2026-09-30 · README and LICENSE at e8be8c445ead8c0d470c7998fdc28446ca9eb47aSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S009 · NimbRo / project contributors
Framework release requirements
Accessed 2026-09-30 · Installation and DependenciesSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
- S010 · NimbRo / project contributors
University project download links
Accessed 2026-09-30 · Software and DownloadSource notes
Source text inspected for the cited scoped claims; see profile claim notes.
Correction guidance · Discussion is not enabled · Profile format 0.5.0-draft.1
Change history
September 29, 2026 — First research profile published.